ABOUT US
Mission & Vision
Transparency
Procurements
Human Resources
Job Offers
Infrastructures
Contact us
IN KIND CONTRIBUTIONS
MEBT
MEBT components
Control & Electronics for the ESS MEBT
RF systems
Modulators
Amplifiers
Distribution system
Low Level RF system
Interlock
Target
Target Wheel
Proton Beam Instrumentation plug
Proton Beam Window
Monolith Vessel
Tuning Beam dump
Miracles Instrument
CAPABILITIES
Manufacturing
Advanced welding
Mechanics
Assembly
In House Projects
ION Source
LEBT
RFQ
High Power RF test stand
Neutron Detectors and Beam Monitors Development
Laboratories
Vacuum
Low Power RF
Neutron Detectors & Radiation Source Lab
COLLABORATIONS
PRESS ROOM
News
In the media
Press releases
Newsletter
Events
Publications
EU
ES
EN
✕
September 30, 2021
September 30, 2021
Desarrollo de un software de medida automatizada “bead pull” de cavidades RFQ para aceleradores de partículas
Master Thesis (2021). UNICAN (ES).
September 27, 2021
September 27, 2021
Desarrollo de un software de medida avanzada de factor de calidad de cavidades resonantes para aceleradores de partículas
Master Thesis (2021). UNICAN (ES).
November 3, 2020
November 3, 2020
Thermal Analysis of the ESS Proton Beam Window
Master Thesis (2020). UPM (ES).
September 14, 2020
September 14, 2020
Diseño de sistemas de control de sintonización de una cavidad Buncher
Master Thesis (2020). UPV/EHU (ES).
July 30, 2020
July 30, 2020
Contribución al proceso de reacondicionamiento de amplificadores klystron para aceleradores lineales de partículas en ESS Bilbao
Master Thesis (2020). UNICAN (ES).
November 12, 2018
November 12, 2018
Diseño y análisis multidisciplinar de la fuente de neutrones de media intensidad propuesta para ESS-Bilbao
Ph. D. Dissertation (2018). UPM (ES).
September 30, 2018
September 30, 2018
Design of the Neutron Time-of-Flight Backscattering Spectrometer MIRACLES for the European Spallation Source
Master Thesis (2018). UPM (ES).
July 20, 2017
July 20, 2017
Effects of irradiation on plasma facing materials in HiPER Laser Fusion Power Plant: Silica Final Lenses and Tungsten First Wall
Ph. D. Dissertation (2017). UPM (ES).
July 14, 2017
July 14, 2017
Verificación de Guías de Gestión de Accidente Severo. Secuencias SBO en reactores PWR
Ph. D. Dissertation (2017). UPM (ES).
1
2
Next page
EN
EU
ES
EN
© 2018 ESS Bilbao. All Rights Reserved.
New corporate video
Nuevo video corporativo